
Ideal Viscount GTE -
Installation, Assembly & Servicing
9
ASSEMBLY
6.
ASSEMBLY OF VISCOUNT GTE BOILERS
IMPORTANT
Important : Assemble the boiler in the
order given by the numbers of each figure,
in compliance with all the instructions
.
Packaging :
Before starting to assemble the boiler, refer to the table below to
check if you have received all the packages required.
Boiler Body and Accessories
GTE boiler
Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Assembled boiler body (contents depend upon model)
1
1
1
1
1
1
1
1
1
1
1
1
Cleaning tool kit (contents depend upon model)
1
1
1
1
1
1
1
1
1
1
1
1
•
Boilers supplied with an assembled body
: start assembly from figure 11
GTE boiler
Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Frame (dimensions depend upon model)
1
1
1
1
1
1
1
1
1
1
1
1
Rear section
1
1
1
1
1
1
1
1
1
1
1
1
Normal intermediate section
9
10
11
12
13
14
14
15
16
17
18
19
Special intermediate section
3
3
3
3
3
3
4
4
4
4
4
4
Front section
1
1
1
1
1
1
1
1
1
1
1
1
Set of assembly rods + cleaning tools
1
1
1
1
1
1
1
1
1
1
1
1
(contents depend upon model)
Standard accessory kit 1 package
(contents depend upon model)
Additional accessory kit 1 package
(contents depend upon model)
Plain furnace plate
1
1
1
1
1
1
1
1
1
1
1
1
Flue gas connection plate ø 450
1
1
1
with opening ø 500
1
1
1
1
Plain flue gas connection plate
1
1
1
1
1
Flue gas box
1
1
1
1
1
1
1
1
1
1
1
1
Distributing tube fitting *
1
1
1
1
1
1
Flow switch and technical instructions
1
1
1
1
1
1
1
1
1
1
1
1
•
Boilers supplied with an unassembled body
:
* The distributing tube fitting for GTE boilers with 15 -19 sections is included in the accessory package.
** The diaphragm fitting for GTE boilers with 14 sections is included in the additional accessory kit package.
FA
4
9
F
A
50*
F
A
51*
F
A
52*
F
A
53*
F
A
54*
FA
5
5
FA
5
6
FA
5
7
FA
5
8
FA
5
9
FA
6
0
F
A
68**
FA
6
9
FA
7
0
FA
7
1
FA
7
2
FA
7
3
FA
7
4
FA
7
5
FA
7
6
FA
7
7
FA
7
8
FA
7
9
GTE boiler
Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Baffle Plates Package CM 22
1
1
1
1
1
Package CM 23
1
1
1
1
1
1
2
2
2
2
2
2
•
Baffle Plates
GTE boiler
Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Casing Fittings
Package FA 5
1
1
1
1
Package FA 6
1
1
1
1
1
1
1
1
Package FA 7
1
Package FA 8
1
1
1
1
1
1
Package FA 9
1
1
1
1
1
Package FA 10
2
2
1
2
2
1
1
Package FA 11
2
2
2
1
1
2
3
3
2
2
3
3
•
Casing Fittings