19
•
Close the furnace door on the 8 studs and fasten with 8
washers and nuts
②
.
20
•
Fit the two doors of the upper flue ways (wing nuts).
•
Fit the plain flange onto the upper connection of the front
section (using four H 18 nuts), with the 170 x 222 gasket in
between (first soak the gasket in warm water).
•
Fit the flange with the sludge removal hole onto the lower
connection of the front section (hole in the lower part of the
flange) using four H 18 nuts, with the gasket in between
(soak in warm water first).
The flame inspection window is fitted with a 1/4" tapped hole for ventilation
(optional) :
-
if a ventilation system is used, connect the hole to the one provided for
that purpose before the burner combustion head.
21
Flame Inspection Window
1
VIS5087
•
Fit the door onto the hinge by inserting the pin
①
.
2
VIS5088