Ideal Viscount GTE -
Installation, Assembly & Servicing
27
ASSEMBLY
36
Assembling the Top Insulating Material (18 - 25 sections)
•
Put in place the two 600 mm wide (packages
FA 37
-
41
) pieces of insulating material on the body of the
boiler.
•
Push the insulating material under the front and rear
crosspieces.
•
Fasten the positioning brackets (package
FA5 or FA6)
onto the right and left-hand upper bosses of the front
section with two H 8x16 screws and two serrated washers
(13 mm spanner).
37
Assembling the Casing Positioning Brackets
VIS5105
80
90
No. of Sections
18
19
20
21
22
23
24
25
Length (mm)
2 x
2 x
2 x
2 x
2 x
2 x
2 x
2 x
1200 1200 1300 1400 1400 1500 1500 1600
VIS5106