
Ideal Viscount GTE -
Installation, Assembly & Servicing
25
ASSEMBLY
29
Assembling the baffle plates
(for boilers supplied with an assembled body only)
in boilers supplied
with an unassembled body, the baffle plates are already in place.
•
Put the baffle plates in place in the upper front flue ways,
taking care to interlock them with each other before
fitting them.
•
Mount the two crosspieces and fasten them onto the rods
with an expansion spring, a nut and a washer.
30
Assembling the Upper Crosspieces (package
FA 5 or FA 6)
(for boilers supplied with an
assembled body only)
In boilers supplied with
an unassembled body, the crosspieces are
already in place (see figure 12)
31
Assembly the Pocket
•
Assemble the pocket for the thermostats and thermometer
in :
- the third special intermediate section - 150 mm wide,
1/2" hole (GTE 14 - 19)
or
- the fourth special intermediate section - 150 mm wide,
1/2" hole (GTE 20 - 25).
•
Plug the two (GTE 14 - 19) or three (GTE 20 - 25) free 1/2"
holes in the special intermediate sections.
Boiler
GTE 14
GTE 15 - 19
GTE 20 - 25
Total number
of baffle
4
6
8
plates
Package no.
CM 23
CM22 + CM23
2xCM23
VIS5098
VIS5099
REAR
REAR
FRONT
FRONT
2mm
2mm
VIS5100
GTE 14 - 19
GTE 20 - 25
FRONT
FRONT