Ideal Viscount GTE
- Installation, Assembly & Servicing
ASSEMBLY
32
Assembling the Cable Channels (14 - 17
sections)
33
Assembling the Top Insulating Material (14 -
17 sections)
•
Place the cable channels so that their bevelled end is to
the front.
•
Fasten with two H 8 x 16 L8 washers in the third
hole starting from the front and opposite the special nut.
•
Fasten at the rear with two H8 x 16 L8 washers
opposite the oblong holes and special nut.
•
Put in place the 600 mm wide (packages
FA 34 - 36
) top
insulating material on the body of the boiler.
34
Assembling the Cable Channels and
Crosspieces (18 - 25 sections)
35
Assembling the Additional Cable Channels
(18 - 25 Sections)
•
Assemble the intermediate piece on the assembly rods by
fitting one slotted side onto one rod and using the flexibility
of the other rod.
•
Place the two cable channels so that their bevelled end is
to the front.
•
Fasten the channels to the front crosspiece with two H 8 x
16 L8 washers in the third hole starting from the
front and opposite the special nut.
•
Fasten the cable channels on the intermediate piece with
two H8 x 16 L8 washers.
•
Align the two additional cable channels with the two others.
•
Fasten them to the intermediate piece and the rear
crosspieces with four H 8 x 16 screws and L8 washers.
VIS5101
AVANT
REAR
90
80
VIS5102
FRONT
No. of Sections
14
15, 16
17
Length (mm)
1800
2100
2200
1
3
2
VIS5103
2
3
No. of Sections
18
19
20
21
22
23
24
25
A (mm)
2510 2600 2800 2910 3000 3110 3200 3310
A
VIS5104