Ideal Viscount GTE -
Installation, Assembly & Servicing
31
ASSEMBLY
41
Installing the Insulating Material
220
90
VIS5112
1
2
3
•
Place the side insulating material against the positioning
bracket
①
and cut it so that it is flush with the upper lug on
which the rail fastening bracket is fixed, along a 220 mm
length
②
.
•
③
Push the insulating material in behind the lug and the
rail fastening bracket.
•
Distribute the insulating material evenly so that you have
the same side insulating material on either side of the boiler.
•
Cut the material similarly along the fastening brackets.
42
A
REAR
FRONT
VIS5113
14 - 17 sections
•
Fix the upper rail with H8 x 30 screws and L8 washers (the
first hole from the front end of the rail must be opposite the
first fastening bracket, and similarly with the other brackets).
•
Push the insulating material behind the lower rail and
underneath the boiler.
•
Join the pieces of insulating material to each other with the
clips.
18 - 25 sections
•
Fix the upper rail with H8 x 30 screws and L8 washers (the
first hole from the front end of the rail must be opposite the
first fastening bracket, and similarly with the other brackets).
•
Fix the additional upper and lower rails, making sure you
comply with dimension A (see table below).
•
Push the insulating material behind the lower rail and
underneath the boiler. Join the pieces of insulating material
to each other with the clips.
Length required while assembling the
two-piece rails (boilers with 18 - 25
sections)
(see table below).
No. of Sections
18
19
20
21
22
23
24
25
A (mm)
2500 2615 2765 2875 2965 3075 3165 3275
Type of
Boiler
GTE 14
1200
600
GTE 15
1200
400
400
GTE 16
1200
400
600
GTE 17
1200
400
600
GTE 18
1200
1200
GTE 19
1200
1200
GTE 20
1200
400
400
600
GTE 21
1200
400
1200
GTE 22
1200
400
1200
GTE 23
1200
600
1200
GTE 24
1200
600
1200
GTE 25
1200
400
400
1200
Side insulating material (length in mm)
FRONT
REAR
Example: GTE 16