
Ideal Viscount GTE -
Installation, Assembly & Servicing
49
CONTROL PANEL
Connecting one or two hour run meters
(package IC8)
One or two optional hour run meters (stage 1 and 2) may be fitted
on the front of the control panel.
Proceed as follows :
-
Cut the cover off with a cutter along the edges of the coloured
rectangle.
-
Pull out the two wires standing by in the control panel.
-
Connect the wires to the hour run meter (the wires are
interchangeable).
-
Clip the hour run meter into the control panel.
If the burner is a one-stage burner, the counter displays the burner
operating time.
If the burner has two stages, the hour run meters display the
operating time of each stage.
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
6A
VIS5158
Connecting the flue gas thermometer
(package ID 28)
An optional flue gas thermometer may be fitted on the front of the
control panel.
Proceed as follows :
-
Cut the cover off with a cutter along the edges of the coloured
rectangle.
-
Clip the thermometer into the opening.
-
Bring the sensor to the back of the boiler via the cable channel
and insert it in the flue gas pipe.
9
8
7
6
5
4
3 2
1
9
8
7
6
5
4
3 2
1
6A
VIS5159