CONTROL PANEL
7.2.4 Starting Up and Operation
IMPORTANT
Initial starting up shall be performed by a
qualified professional.
30
l
0
6A
1
9
3 2
5
VIS5164
Before turning the boiler on, make sure that the installation is filled
with water.
Perform the start-up operations in the order given below:
•
Boiler temperature regulation by means of the
thermostats.
Set boiler thermostats
5
to the selected position. If the burner has
two stages, the stage 2 thermostat must always be set to value
which is approximately 5ºC less than that of the stage 1 thermostat.
If required, move the maximum temperature stop as instructed below.
IMPORTANT
If there is no control unit, we advise you never to
set the boiler thermostat below mark
4
(approx.
40ºC) in order to avoid the risk of combustion
products condensing on the walls of the boiler.
•
Set switch
1
to the
manual
position .
•
Control unit in heating cabinet
•
Make sure that safety thermostat
9
is set by unscrewing the
hexagonal cap and pressing the reset button with a
screwdriver
•
Set the burner and heating pump buttons 2 to the Winter
. position.
•
Set main On/Off switch 3 to the On .
Moving the thermostat stop:
The stop is factory-set to limit the maximum temperature to 75ºC.
To move the stop, proceed as follows:
-
Pull the thermostat button out carefully (use pliers and a
cloth).
-
Remove the stop with the pliers.
-
Put the stop in the hole of the desired higher temperature
(maximum 85ºC).