
30
Ideal Viscount GTE
- Installation, Assembly & Servicing
ASSEMBLY
39
•
Fasten the lower rail with H 8x30 screws and L8 washers.
•
The other rail support brackets are fastened opposite
the holes provided on the lower rail.
40
Assembly Direction of Lower Rail Support Brackets
(seen from the top of the frame)
Length required while assembling the two-piece rails
(boilers with 18 - 25 sections) (see fig. 42)
FRONT
VIS5110
3
1
❷
❷
❷
VIS5111
4
•
Fix the fastening bracket of the upper rails (package
FA5
or FA
6) on the upper lug
①
(these brackets must be
vertically aligned with the lower rail support
brackets)
.
Fit the bracket onto the stub
②
.
•
Fasten with H 10x50 screws and serrated washers and H10
nuts
③
.
•
Assemble the Rapid nut on the top of the bracket
with the
tapped shaft on the inside.
4