46
Ideal Viscount GTE
- Installation, Assembly & Servicing
7.1.5 Starting Up and Operation
CONTROL PANEL
C
30
0
I
6A
7
6
5
4
2
1
3
VIS5153
Before turning the boiler on, make sure that the installation is
filled
with water
.
Perform the start-up operations in the order given below :
•
Boiler temperature regulation by means of the
thermostats.
Set boiler thermostats
3
to the selected position. If the burner has
two stages, the stage 2 thermostat must always be set to value
which is approximately 5°C less than that of the stage 1 thermostat.
If required, move the maximum temperature stop as instructed below.
•
Control unit in heating cabinet
Refer to the instructions supplied with the control unit.
•
Make sure that safety thermostat 7 is set
by unscrewing
the hexagonal cap and pressing the reset button with a
screwdriver.
•
Set main On/Off switch
1
to the On .
IMPORTANT
Initial starting up shall be performed by a
qualified professional.
IMPORTANT
If there is no control unit, we advise you never
to set the boiler thermostat below mark
4
(approx. 40ºC) in order to avoid the risk of
combustion products condensing on the walls
of the boiler.
Moving the thermostat stop
:
The stop is factory-set to limit the maximum temperature to 75°C.
To move the stop, proceed as follows :
-
Pull the thermostat button out carefully (use pliers and a
cloth).
-
Remove the stop with the pliers.
-
Put the stop in the hole of the desired higher temperature
(maximum 85°C).
9
8
7
6
5
4
3
9
8
7
6
5
4
VIS5154
① ② ③ ④ ⑤