
Ideal Viscount GTE -
Installation, Assembly & Servicing
47
CONTROL PANEL
9
1
13
10
6
5
14
2
3
7
8
4
VIS5155
30
l
0
6A
7.2 De Luxe Control Panel
7.2.1 Description
1.
Three-position switch Auto /Manual / / TEST STB
The switch may be left on either position manual or
automatic
AUTO
.
Test STB:
temporary action to test the safety thermostat:
Press the TEST STB switch and set pump shut-off switch 2
. to the "summer" position .
2.
Double Switch Burner / Heating pump:
This double button is used to control the burner and the
heating pump.
Both buttons are in "Winter" position:
heating and hot water production systems operate (if a hot
water tank is included).
Both buttons are in "Summer" position:
only the domestic hot water production system operates (if
a hot water tank is included).
3.
Main ON/OFF switch
4.
Location for hour run meter
for the first and second stage (optional).
5.
Boiler thermostats
(with 30º to 85ºC adjustment range):
A factory-set stop limits the maximum temperature to 75ºC.
The stop may be moved if necessary (see section 5.1).
6.
Stage 1 or stage 2 indicators:
These only go on if the relevant thermostat or control unit
require heating and if the safety contact is closed.
7.
Boiler thermometer
8.
Location for flue gas thermometer
(optional)
9.
Safety thermostat with manual reset
(set to 110ºC).
10.
6 A Circuit-breaker
with delayed action and manual reset.
13.
Switch for selecting the number of burner stages
14.
Burner alarm indicator