
10
Ideal Viscount GTE
- Installation, Assembly & Servicing
ASSEMBLY
GTE boiler
Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Package FA 16
1
1
1
1
1
1
1
1
Package FA 17
1
Package FA 18
1
Package FA 19
1
Package FA 20
1
Package FA 21
1
Package FA 22
1
Package FA 23
1
Package FA 24
1
1
Package FA 25
1
Package FA 26
1
Package FA 27
1
•
Variable Casing Parts
GTE boiler
Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Body insulating material
Package FA 34
1
Package FA 35
1
Package FA 36
1
1
Package FA 37
1
1
Package FA 38
1
Package FA 39
1
1
Package FA 40
1
1
Package FA 41
1
•
Body Insulating Material
GTE boiler
Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Standard control panel
Package FA 3
1
1
1
1
1
1
1
1
1
1
1
1
De Luxe control panel
Package FA 2
1
1
1
1
1
1
1
1
1
1
1
1
•
Control Panel
GTE boiler
Number of sections
14
15
16
17
18
19
20
21
22
23
24
25
Burner plate with 165, 186, 210, 240 or 295 ø hole
1
1
1
1
1
1
1
1
1
1
1
1
Smokehood plate with 400 ø opening or plain smokehead plate
1
1
1
1
1
1
1
1
1
1
1
1
•
Accessories Available as an Option*
Tools Required:
-
JD-TE or JD-TE Plus assembly tool (+ extension for GT 22
or larger)
-
Flat screwdriver
-
No. 2 Pozidrive screwdriver
-
10, 13, 17 and 19 mm spanners
-
2mm tubular box spanner
-
27 mm tubular box spanner
-
electric screw No. 2 Philips bit
-
Stanley knife
-
Silicone filler (supplied)
•
If the boiler is supplied with an assembled body
, start
assembly from Figure 29.
•
Assemble the boiler body from the rear to the front
:
- assemble the
rear
section,
- assemble all the
normal intermediate
sections,
- assemble all the
special intermediate
sections,
- assemble the
front
section.