Ideal Viscount GTE
- Installation, Assembly & Servicing
ASSEMBLY
13
Assembling the Baffle Plates
•
Put the baffle plates into place in the upper front flue ways,
taking care to interlock them with each other before
fitting them.
VIS5080
Boiler
GTE 14
GTE 15-19
GTE 20-25
Total number
of baffle
4
6
8
plates
Package no.
CM23
CM22 + CM23
2xCM23
14
Assembling the Sweeping Covers
•
Clean off the protective varnish on the ground surfaces with
solvent.
•
The covers are numbered from 1 to 4, and must be fitted
with a thermocord
①
.
The length of the thermocord depends upon the cover and
is given below.
Type
Thermocord Length
1
1335 mm
2
1110 mm
3
890 mm
4
665 mm
Cover Model
No 1
No 2
No 3
No 4
Type of
Boiler
FRONT
REAR
GTE 14
2
6
GTE 15
2
4
2
GTE 16
2
4
2
GTE 17
2
6
GTE 18
2
2
6
GTE 19
2
6
2
GTE 20
2
6
2
GTE 21
2
8
GTE 22
2
6
2
2
GTE 23
2
6
4
GTE 24
2
8
2
GTE 25
2
10
Number of sweeping covers per type
•
Place the two no. 1 sweeping covers (with the handles turned
outward) on either side of the boiler starting from the front.
Distribute the other covers evenly.
Each cover is fitted with a system whereby it can only be
mounted with the handles turned outward.
•
Fit the two locks of each cover between the sections.
•
Push the cover towards the outside of the boiler, to the
“closed” position
①
.
•
Fasten the two brass nuts of each cover
.
1
2
3
4
VIS5081
Handles turned
outward
REAR
FRONT
19
4