Blade Filler Panels . . . . . . . . . 179
Blade filler panel removal and replacement .
Cable management fingers overview
Time and items required for removal and
replacement .
Removing the cable management finger assembly
Installing the cable management fingers
Replacing the Chassis . . . . . . . 191
Chassis replacement overview .
Precautions specific to chassis replacement
Chassis replacement task guide .
Customer replacement responsibilities .
Recording critical device and SAN
information .
Disconnecting from network and fabric
Reconnecting system to the network and
fabric .
Downloading the configuration .
Verifying correct operation of system
Verifying correct configuration of the fabric
IBM service replacement responsibilities
Removing components from the chassis
Installing the replacement chassis
Installing components into the chassis .
Synchronizing airflow direction on WWN
cards .
Removing the battery . . . . . . . . 205
Step 3. Attach the stabilizers .
Step 4. Attach the rack to a concrete floor .
Step 5. Attach the rack to a concrete floor
beneath a raised floor
Step 6. Attach the mounting plates .
Step 7. Attach the front door .
Step 8. Check the customer's ac power source
Step 9. Check the intelligent power distribution
units .
Step 10. Connect switch and device cables.
Director power-off procedure .
Removing and replacing the iPDUs .
Removing the side-mounted iPDU .
Replacing the side-mounted iPDU
Removing and replacing the front or rear rack
door .
Intelligent power distribution units .
iPDU for director attachment .
Appendix B. Product Specifications
Notices . . . . . . . . . . . . . . 251
Federal Communications Commission Statement 252
Industry Canada Compliance Statement
Australia and New Zealand Class A Statement
European Union Electromagnetic Compatibility
Directive .
Germany Electromagnetic Compatibility
Directive .
People's Republic of China Class A Statement
Japan Voluntary Control Council for Interference
Class A Statement .
Japan Electronics and Information Technology
Industries Association Statement .
Korean Communications Commission Class A
Statement
Russia Electromagnetic Interference Class A
Statement
Index . . . . . . . . . . . . . . . 259
Contents
v
||
Summary of Contents for SAN256B-6
Page 6: ...vi SAN256B 6 Installation Service and User Guide...
Page 10: ...x SAN256B 6 Installation Service and User Guide...
Page 22: ...xxii SAN256B 6 Installation Service and User Guide...
Page 24: ...xxiv SAN256B 6 Installation Service and User Guide...
Page 34: ...6 SAN256B 6 Installation Service and User Guide...
Page 72: ...44 SAN256B 6 Installation Service and User Guide...
Page 92: ...64 SAN256B 6 Installation Service and User Guide...
Page 108: ...80 SAN256B 6 Installation Service and User Guide...
Page 152: ...124 SAN256B 6 Installation Service and User Guide...
Page 162: ...134 SAN256B 6 Installation Service and User Guide...
Page 198: ...170 SAN256B 6 Installation Service and User Guide...
Page 206: ...178 SAN256B 6 Installation Service and User Guide...
Page 210: ...182 SAN256B 6 Installation Service and User Guide...
Page 214: ...186 SAN256B 6 Installation Service and User Guide...
Page 218: ...190 SAN256B 6 Installation Service and User Guide...
Page 258: ...230 SAN256B 6 Installation Service and User Guide...
Page 278: ...250 SAN256B 6 Installation Service and User Guide...
Page 286: ...258 SAN256B 6 Installation Service and User Guide...
Page 289: ...WWN card power down replacement 156 Index 261...
Page 290: ...262 SAN256B 6 Installation Service and User Guide...
Page 291: ......
Page 292: ...IBM Part Number 01JC333 Printed in USA SC27 8967 03 1P P N 01JC333...