13.
If the blade is not being replaced by another blade, install a filler panel and reinstall the chassis door.
The filler panel is required for proper chassis cooling. The door is required to meet EMI compliance.
Installing a core routing blade
About this task
Complete the following steps to replace the core routing blade.
Note:
The device continues to operate while a core routing blade is being replaced.
Procedure
1.
If a protective sleeve is covering the blade connectors remove the sleeve.
2.
Rotate the ejector handles away from center of blade completely - approximately 45 degrees. Do not
support the blade using ejector handles. Orient the blade so that the handles are toward you and the
flat metal side is facing down.
3.
Follow these steps to insert the blade into the slot.
a.
Align the blade in the slot with the flat metal side of the blade at the bottom (blade power and
status LEDs are on the left).
b.
Carefully push the blade into the slot using your thumbs or fingers on the blade faceplate.
CAUTION:
To avoid damaging blade and chassis, do not use ejector handles to push the blade into or pull
the blade out from a slot.
When the blade face is about 2.54 cm (1 in.) from the chassis, you should feel resistance as the
blade connectors meet the backplane connectors.
c.
Continue pushing with your thumbs or fingers until the ejectors move in towards the blade
slightly indicating that the connectors are engaged.
Figure 59. Removing and installing a core routing blade
132
SAN256B-6 Installation, Service, and User Guide
Summary of Contents for SAN256B-6
Page 6: ...vi SAN256B 6 Installation Service and User Guide...
Page 10: ...x SAN256B 6 Installation Service and User Guide...
Page 22: ...xxii SAN256B 6 Installation Service and User Guide...
Page 24: ...xxiv SAN256B 6 Installation Service and User Guide...
Page 34: ...6 SAN256B 6 Installation Service and User Guide...
Page 72: ...44 SAN256B 6 Installation Service and User Guide...
Page 92: ...64 SAN256B 6 Installation Service and User Guide...
Page 108: ...80 SAN256B 6 Installation Service and User Guide...
Page 152: ...124 SAN256B 6 Installation Service and User Guide...
Page 162: ...134 SAN256B 6 Installation Service and User Guide...
Page 198: ...170 SAN256B 6 Installation Service and User Guide...
Page 206: ...178 SAN256B 6 Installation Service and User Guide...
Page 210: ...182 SAN256B 6 Installation Service and User Guide...
Page 214: ...186 SAN256B 6 Installation Service and User Guide...
Page 218: ...190 SAN256B 6 Installation Service and User Guide...
Page 258: ...230 SAN256B 6 Installation Service and User Guide...
Page 278: ...250 SAN256B 6 Installation Service and User Guide...
Page 286: ...258 SAN256B 6 Installation Service and User Guide...
Page 289: ...WWN card power down replacement 156 Index 261...
Page 290: ...262 SAN256B 6 Installation Service and User Guide...
Page 291: ......
Page 292: ...IBM Part Number 01JC333 Printed in USA SC27 8967 03 1P P N 01JC333...