5.
Ensure that the 2145 UPS-1U is turned on. Press and hold the 2145 UPS-1U test button for three
seconds to start the self-test. If any of the Alarm, Battery, or Overload indicators are on or the buzzer
is sounding, go to MAP 5150 in the
IBM System Storage SAN Volume Controller Troubleshooting Guide
to
resolve the problem.
Note:
Ignore all error indicators until the self-test has been run.
6.
Turn on the SAN Volume Controller.
Note:
If the new battery does not have enough charge to support the actions that are required during
a power failure, the SAN Volume Controller node pauses with
Charging
displayed on its front panel
until a sufficient charge is available. If there is a sufficient charge to support the actions that are
required during a single power failure but not sufficient charge to support two power failures, the
node starts and joins the cluster but displays
Recovering
on its front panel.
svc00069
Figure 335. Replacing the 2145 UPS-1U front panel
322
IBM SAN Volume Controller Hardware Maintenance Guide
Summary of Contents for SAN Volume Controller 2145-CG8
Page 1: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Page 2: ......
Page 3: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Page 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 24: ...xxii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 30: ...xxviii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 54: ...24 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 362: ...332 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 364: ...334 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 371: ......
Page 372: ...Part Number 31P1584 Printed in USA GC27 2283 00 1P P N 31P1584...