7-126
Gland assembly
Rod assembly
20
Insert
Piston assembly
18
19
Item
Boom
Arm
Bucket
Dozer
Boom swing
18
18
18
17
18
82
Ü
8
82
Ü
8
73
Ü
7
150
Ü
15
93
Ü
9
593
Ü
59
593
Ü
59
528
Ü
53
1085
Ü
109
673
Ü
67
kgf
Â
m
lbf
Â
ft
Fit piston nut(18) and set screw(19).
Â
Tightening torque :
Μ
Fit piston assembly to rod assembly.
Λ
Insert cushion ring(20) to rod assembly.
Note that cushion ring(20) has a direction
in which it should be fitted.
Κ
ö
I
I
nstall piston and cylinder head
Fix the rod assembly to the work bench.
Apply hydraulic oil to the outer surface of
rod assembly(2), the inner surface of
piston and gland.
Insert gland assembly to rod assembly.
(3)
Η
Θ
Ι
R5577CY45
R35Z77CY32
R35Z77CY34
R35Z77CY33