
4-11
CHECK POINT
1. POWER CIRCUIT
The negative terminal of battery is grounded to the machine chassis.
When the start switch is in the OFF position, the current flows from the positive battery terminal as
shown below.
OPERATING FLOW
Battery Master switch[CS-74] Fusible link(CN-60) Start switch[CS-2(1)]
I/conn[CN-5(2)]
Engine
Start switch
Check point
Voltage
1)
ö
GND : Ground
OFF
OFF
Η
- GND (Battery)
Θ
- GND (Master switch)
Ι
- GND (Fusible link)
10~12.5V
2
2
)
ö
I/conn : Intermediate connector
Fuse box[No.1] I/conn[CN-8(5)] I/conn[CN-1(1)] Cluster[CN-48(1)]
I/conn[CN-11(1)]
Room lamp[CL-1(1)]
Cassette radio[CN-27(11)]