7-70
Disassembly of plunger sub assy is not
required when it operates normally.
Insert pin S-1, dia. 5.5
Ý
30, in the through
hole dia.6 of the plunger sub assy, and fix
it with vase.
Â
Tools required :
Torque wrench (No. 2)
Hexagonal bit for torque wrench (No. 8)
Pin (S-1)
(5)
Steel pin
R35Z77TM06
Remove spring (31-3), check valve (31-2).
And store the parts so that the respective
parts make a set as it was when
assembling again, taking care of the
combination of the right and left check
valves to the plunger.
(6)
31
31-2
31-3
R35Z77TM07
Remove plugs (43), (46).
Â
Tools required :
Torque wrench (No. 2)
Hexagonal bit for torque wrench (No. 9)
Socket for torque wrench (No. 11)
(7)
43
46
R35Z77TM08
Removing spring (42), spool assy (41).
Be careful not to damage around the
spool.
(8)
41
42
R35Z77TM09