
6-18
PB
Preparation
Stop the engine.
Push the pressure release button to
bleed air.
Install a connector and pressure gauge
assembly to swing motor PB port, as
shown.
Start the engine and check for oil
leakage from the adapter.
Keep the hydraulic oil temperature at 50
Ü
5
Á
C.
M
M
easurement
Operate the swing function or arm roll in
function and measure the swing brake
control pressure with the brake
disengaged. Release the control lever to
return to neutral and measure the control
pressure when the brake is applied.
Repeat three times and calculate the
average values.
Evaluation
(1)
Η
Θ
Ι
Κ
Λ
(
(
2)
Η
Θ
The average measured pressure should be within the following specifications.
Unit : kgf / cm
2
S
SWING PARKING BRAKE RELEASING PRESSURE
15)
(3)
Model
R35Z-7
Description
Brake disengaged
Brake applied
Standard
30
Ü
5
0
Remarks
R35Z76MC16