SERVICE WORK ON THE ENGINE 18
133
V01631-01
–
Insert the oil screen and mount the angle piece with a new
hose clamp.
Hose clamp pliers (60029057000)
S04860-10
–
Mount throttle valve body
6
.
–
Remove the locking piece and position the subframe.
Info
Pay attention to intake flange
5
.
–
Join plug-in connector
4
of the rear brake light switch.
–
Position and tighten clamps
3
of the throttle valve body.
Guideline
Screw, intake
flange/reed valve
housing
M6
6 Nm (4.4 lbf ft)
S04857-10
–
Mount and tighten screws
1
.
Guideline
Screw, sub-
frame bottom
M8
30 Nm (22.1 lbf ft)
Loctite
®
2701™
–
Remove screws
2
.
–
Mount and tighten screws
2
.
Guideline
Screw, sub-
frame bottom
M8
30 Nm (22.1 lbf ft)
Loctite
®
2701™
Finishing work
–
Remove the motorcycle from the lift stand. (
–
Install the fuel tank.
–
Install the right side cover. (
–
Add 2-stroke oil. (
–
Prime the oil pump.
–
Mount the seat. (
–
Install the air filter box cover. (
–
Install the main silencer. (
Summary of Contents for TE 250
Page 1: ...OWNER S MANUAL 2023 TE 250 TE 300 Art no 3402635en ...
Page 2: ......