90
9 Installing and Routing Subrack Power Cables
Universal Platform Subrack
d
Install the front panel of the PIU board. This completes the procedure of installing subrack power cables.
The upper power cables connecting to the upper PIU board do not traverse the fiber trough, but the power cables
connecting to the lower PIU board must be routed through the fiber trough.
Route the power cables through the bottom of the fiber spool, direct them through the hole on the mounting ear to the
side of the cabinet, and let them out of the cabinet through the designated hole at the top the cabinet.
Route and secure the power cables to the cabinet according to the figure below.
When power cables are preinstalled on subracks or on the right side of a cabinet