83
NOTE
Install OT terminals of power cables and keep them vertical. Install all associated
covers after connecting all power and NM cables.
M3
2#
screwdriver
0.39
±
0.04 N.M
M3
2#
screwdriver
0.39
±
0.04 N.M
M6
3#
screwdriver
4.90
±
0.49 N.M
9 Installing and Routing Subrack Power Cables
T32 Subrack
b
When power cables are preinstalled on subracks
Secure the power cables.