85
9 Installing and Routing Subrack Power Cables
T32 Subrack
b
M3
2#
screwdriver
0.39
±
0.04 N.M
M3
2#
screwdriver
0.39
±
0.04 N.M
M6
3#
screwdriver
4.90
±
0.49 N.M
When power cables are preinstalled on the right side of a cabinet
Secure the power cables.