background image

Neuron NFR2000

Version 4.1 | March 2022

INSTALLATION AND SERVICE MANUAL

Summary of Contents for Neuron NFR2000

Page 1: ...Neuron NFR2000 Version 4 1 March 2022 INSTALLATION AND SERVICE MANUAL...

Page 2: ......

Page 3: ...mational purpose and use only and subject to change without notice This manual cancels and replaces any previous versions thereof Copyright Copyright 2003 2022 EVS Broadcast Equipment SA All rights re...

Page 4: ......

Page 5: ...EVER operate this product if any cover is removed NE JAMAIS utiliser ce produit si le couvercle est retir NEVER wet the inside of this product with any liquid Ne mouillez JAMAIS l int rieur de ce prod...

Page 6: ...professional use as mentioned below Ce produit est conforme aux exigences des normes r latives la famille de produits d quipements de contr le d clairage de spectacle audio vid o et audiovisuel usage...

Page 7: ...ation and maintenance of the NFR2000 is considered service action L installation et la r vision du NFR2000 sont consid r es comme des actions d entretien The equipment is intended for installation in...

Page 8: ...assis of the unit For continued protection against electric shock a correctly wired and grounded earthed three pin power outlet must be used Do not use a ground lifting adapter and never cut the groun...

Page 9: ...t Description 4 2 2 LED Indicators 6 3 Installation 7 3 1 Preparing the Product for Installation 7 3 2 Unpacking 7 3 3 Module layout 7 3 4 Processing Module Installation and Replacement 8 3 5 Power Su...

Page 10: ...ICONOGRAPHY Note Tip Warning viii March 2022 Issue 4 1 G...

Page 11: ...has been added next to the text to highlight information on new and updated features The changes in the NFR2000 manual are listed below Dimensions diagrams See section Nominal Dimensions on page 14 IN...

Page 12: ......

Page 13: ...ions de manipulation de dispositifs sensibles l lectricit statique Unpacking EVS has carefully inspected this product before shipment to ensure years of trouble free service Upon reception please make...

Page 14: ...kaging available please use your own packaging as long as it meets the following criteria Is able to withstand the weight of the product Holds the product snugly within the packaging Leaves at least 5...

Page 15: ...the horsepower of our most powerful Synapse card This equates to 6 times more horsepower per rack unit RU at a maximum of 50 of the electrical power usage of Synapse Please visit the EVS Broadcast Eq...

Page 16: ...essing modules from the back for broadcast versions and from the front for datacenter versions Redundant power supplies from the front for broadcast versions and from the back for datacenter versions...

Page 17: ...Broadcast Version In the Broadcast version the power supplies and the I O connectors are on the back Front View Rear View INSTALLATION AND SERVICE MANUAL Neuron NFR2000 2 Introduction to Neuron 5...

Page 18: ...Green constant Power present controlled no errors Green blinking Power present not controlled no errors Red constant No power present or AC DC converter defect controlled internal communication error...

Page 19: ...act your EVS dealer if parts are missing or damaged or when products on the packing list are missing 3 2 Unpacking The Neuron frame must be unpacked and installed in an anti static environment Make su...

Page 20: ...d firmly into the frame If a module slot remains empty the empty slot should be fitted with a blind panel 3 5 Power Supply Installation and Replacement Installing or Replacing the Power Supply in an N...

Page 21: ...e power supplies When fans are reported as defective by Cortex or Cerebrum the PSU will have to be replaced If service has to be performed on the frame please ensure that the power supplies are switch...

Page 22: ...e puissance et doit toujours tre orient vers le haut Mounting of the equipment in the rack should be such that a hazardous condition is not created due to uneven mechanical loading Electrical Connecti...

Page 23: ...ight 44 mm 1 73 1RU Width 483 mm 19 Depth including power supply excluding processing module 605 mm 23 82 Depth including power supply and processing module 615 mm 24 21 Weight Weight without modules...

Page 24: ...W Fuse 250V 8 A fast 2x not serviceable Max power per slot 200W Power factor full load 0 95 Each PSU is fused internally not customer serviceable Cooling Fans 4 fans in each PSU Required air volume fo...

Page 25: ...UT is 1 meter Frames are placed one meter from the ground in a 19 rack of 47 RU All unused space is closed with blind panels NFR2000 Broadcast version fully loaded 80 dB A preliminary NFR2000 Datacent...

Page 26: ...5 Nominal Dimensions The following diagrams show the nominal dimensions of the Neuron NFR2000 frame in mm Top 14 March 2022 Issue 4 1 G...

Page 27: ...Side Back INSTALLATION AND SERVICE MANUAL Neuron NFR2000 5 Nominal Dimensions 15...

Page 28: ......

Page 29: ......

Page 30: ......

Reviews: