Scenario
Component
Installation Holes
4 x T16
subracks
PDU
81, 83
T16 subrack
61, 62, 75, 77
T16 subrack
43, 44, 57, 59
T16 subrack
24, 25, 38, 40
T16 subrack
6, 7, 20, 22
DCM
1, 2
3 x T16
su
1 x 6800
subrack
PDU
81, 83
T16 subrack
62, 63, 76, 78
T16 subrack
44, 45, 58, 60
T16 subrack
24, 25, 38, 40
6800 subrack
7, 8, 21, 22
DCM
1, 2, and 3, 4
2 x T16
su
2 x 6800
subracks
PDU
81, 83
T16 subrack
61, 62, 75, 77
T16 subrack
43, 44, 57, 59
6800 subrack
24, 25, 38, 39
6800 subrack
8, 9, 22, 23
DCM
1, 2, and 3, 4
1 x T16
s 3
x 6800
subracks
PDU
81, 83
T16 subrack
61, 62, 75, 77
6800 subrack
42, 43, 56, 57
6800 subrack
24, 25, 38, 39
6800 subrack
8, 9, 22, 23
DCM
1, 2, and 3, 4
14
1
2
82
83
Deploying T16 Subracks or T16 and Other Subracks in the Same N63B Cabinet
c
1 Installation Holes for the Subrack
The installation holes on an N63B cabinet are numbered 1 to 83 from bottom to top.
Installation holes on an N63B cabinet
Front side of an N63B cabinet