79
9 Installing and Routing Subrack Power Cables
1. Do not install or remove power cables while the equipment is powered on. Ensure that the power is
switched off prior to removing or installing a power cable to avoid bodily injuries.
2. The DPD63-8-8 PDU and TN16PDU have more than one power input. To power off equipment, do
disconnect all power inputs of the PDU.
On site, you need to connect power cables to PIU boards, and
ground cables, cascading network cables, and cascading fibers to
subracks. Inside a cabinet, power cables, ground cables, and
cascading network cables for the subracks delivered separately have
already been installed according to the positions where these
subracks are to be installed. The connectors of these cables are stuck
with labels indicating the corresponding ports into which these
cables are to be inserted. See the figure on the right.
CAUTION
CAUTION
OSN 8800 T64/T32
PDU
Subrack Power Cables
TN51PDU
TN16PDU
DPD63-8-8 PDU
OSN 8800 T16
PDU
Subrack Power Cables
TN16PDU
DPD63-8-8 PDU
OSN 8800 Universal platform Subrack
PDU
Subrack Power Cables
DPD63-8-8 PDU