The installation holes on the front/rear side of an N66B
cabinet are numbered 1 to 83 from bottom to top.
Scenario
Component
Installation Holes
Remarks
1 x T64
s
4 x T16
subracks
PDU
81, 83
-
T64
44, 46, 58, 59,
74, 76
-
T16
24, 25, 38, 40
The same numbered
installation holes are
used to install T16
subracks on the front
and rear sides of the
cabinet.
T16
6, 7, 20, 22
DCM
1, 2
Two DCM frames
need to be installed.
The same numbered
installation holes are
used to install the
DCM frames on the
front and rear sides of
the cabinet.
1 x T64
s
4 x
universal
platform
subracks
PDU
81, 83
T64
44,46,58,59,74,
76
universal
platform
subracks
24,25,38,39
The same numbered
installation holes are
used to install
universal platform
subracks on the front
and rear sides of the
cabinet.
universal
platform
subracks
8,9,22,23
DCM
1, 2, and 3, 4
Four DCM frames
need to be installed.
The same numbered
installation holes are
used to install the
DCM frames on the
front and rear sides of
the cabinet.
1 Installation Holes for the Subrack
Deploying T64 and Other Subracks in the Same N66B Cabinet
a
Installation holes on the front/rear side of an N66B cabinet
Front side of an N66B cabinet