IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
3 Installation Scenarios in Dual Row Aisle Containment
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
64
Step 2
Measure the levelness of the doorhead with a level. If the doorhead is not level:
Adjust its anchor bolts.
Insert no more than one spacer under a post. The spacer is 0.6 mm thick and is delivered
with the doorhead.
Figure 3-42
Inserting a spacer under a post
----End
Follow-up Procedure
Add spacers if door posts are lifted in the air after the adjustment.
Installing Door Panels
Procedure
Step 1
Lift a door panel, and secure the door panel to a post using the three hinges. Perform the same
operations to secure the other door panel.