IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
10 Cable Layout
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
240
Figure 10-70
Ports on the HIPULSE-NXL UPS
(1) RUN indicator
(2) COM1 port
(3) COM2 port
Step 2
Connect the other end of the network cable to the Ethernet port on the switch.
----End
10.12.35 Connecting a Monitoring Cable to a HIPULSE U UPS
Prerequisites
A network cable used for monitoring is prepared.
You are familiar with the functions of all ports on the CCU collector by referring to
10.12.2 Port Description for the CCU Collector
You are familiar with the functions of all ports on the ECC collector by referring to
10.12.3 Port Description for the ECC Collector
Context
There are three slots in the monitoring board of the HIPULSE U UPS to house a Modbus card:
Intellislot 1, Intellislot2, and Intellislot 3. You can insert a Modbus card into any of the three
slots.
Procedure
Step 1
Connect one end of the network cable to the RS485 port on the Modbus card.
Step 2
Connect the other end of the network cable to the RS485 port on the CCU collector or ECC
collector.
----End
10.12.36 Connecting a Monitoring Cable to a Galaxy7000 UPS
Prerequisites
A network cable used for monitoring is prepared.