Component
Configuration
Configuration Number
380/415 V AC, 160 A, 3P,
36 kA, C, 102 (W)*70
(D)*130 (H)
Battery cable
Battery Accessory, SD-384
V 65 Ah/12 V-PX-35 (ET),
Battery Cabinet Installation,
600 mm (W)*1100 mm
(D)*2000 mm (H), Top out,
Cables for battery group
SHOTO 6-GFM-65
embedded in battery cabinet
of IDC (25 mm
2
), IDC
special
1 PCS
Figure 10-35
Conceptual diagram of battery cable connections
Configuration 11
Configuration 11 applies to the following scenarios:
36 kW < actual total power ≤ 72 kW; backup time: 15 minutes
48 kW < actual total power ≤ 72 kW; backup time: 15 minutes