IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
10 Cable Layout
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
171
Figure 10-26
Conceptual diagram of battery cable connections
Configuration 2
Configuration 2 applies to the following scenarios:
16 kW < actual total power ≤ 24 kW; backup time: 30 minutes
24 kW < actual total power ≤ 32 kW; backup time: 30 minutes
32 kW < actual total power ≤ 36 kW; backup time: 30 minutes
The following table describes battery cabinet configuration.
Table 10-3
Battery cabinet configuration 2
Component
Configuration
Configuration Number
Battery
Rechargeable Battery 480
V-65 Ah Battery
A string of 40 batteries
Battery tray
Battery tray for 4 batteries
10 PCS
Circuit breaker
Circuit breaker,
Pyromagnetic Breaker, 380
V AC/500 V DC, 125 A, 4P,
36 kA, 102 (W)*70 (D)*130
1 PCS