IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
11 Check after Installation
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
253
Cable Installation Check
Table 11-2
Cable installation check items
No.
Check Whether
Check Result
1
All cable joints are secured properly,
especially the cable joints between
network cables.
□Passed. □Failed.
2
Exposed parts near the wiring
terminals and lugs are wrapped in PVC
insulation tape or heat shrinking
tubing.
□Passed. □Failed.
3
The flat washers and spring washers of
all wiring terminals are securely
installed.
□Passed. □Failed.
4
Cables are bound neatly and cable ties
are secured evenly and properly.
□Passed. □Failed.
5
Routed cables should be convenient for
future maintenance and expansion.
□Passed. □Failed.
6
All labels at the cable ends are clear.
□Passed. □Failed.
7
The excess section of a cable strip is
cut evenly.
□Passed. □Failed.
8
There are no unnecessary adhesive
tape or cable ties on cables.
□Passed. □Failed.
Electrical Installation Check
Table 11-3
Electric installation check items
No.
Check Whether
Check Result
1
All ground cables are copper cables.
Cable diameters are correct. No
switches or fuses are installed on the
cables and no short circuit occurs.
□Passed. □Failed.
2
The ground cable, AC power cables,
and internal cables are correctly
connected and screws are secured. No
short circuit occurs during power input
or output.
□Passed. □Failed.
3
The length of ground cables and power
cables is correct.
□Passed. □Failed.
4
Lugs for power cables and PGND
cables are soldered or crimped
□Passed. □Failed.