WARNING:
To reduce the risk of personal injury or damage to equipment:
• Extend the leveling jacks to the floor.
• Ensure that the full weight of the rack rests on the leveling jacks.
• Install the rack stabilizer kit on the rack.
• Extend only one rack component at a time. Racks might become unstable if more than one
component is extended.
IMPORTANT:
Do not replace both the base chassis and the base module controller with repair components in the
same procedure. The firmware will not allow the library to operate if both components are replaced
at the same time. The library WWID and serial number are saved in the controller and within the
chassis. When one is replaced, the data from the original component is transferred to the repair
component. If replacing both the base chassis and base module controller, you must power cycle
the library between component replacements.
Prerequisites
Tools required
• Two small flat head or Torx screwdrivers
• #1 Phillips screwdriver
• #2 Phillips screwdriver
CAUTION:
If the temperature in the room where the module will be installed varies by 15º C (30º F) from the
room where it was stored, allow the module to acclimate to the surrounding environment for at least
12 hours before unpacking it from the shipping container.
Procedure
1.
Save the library configuration
2.
and verify that the robotic assembly is parked in the base module.
3.
4.
5.
6.
7.
Remove the library or expansion controller and drive power boards
8.
Remove the module from the rack
9.
10. Install the module in the rack
Upgrading and servicing the library
139