Hardware options installation 68
8.
Using the T-15 screws, secure the optical drive cage.
9.
The Torx screws required to install optical drives are located on the chassis.
10.
For tower models, do the following:
a.
Install the access panel (on page
24
).
b.
Return the server to an upright position.
11.
For rack models, do the following:
a.
Install the rack bezel (on page
23
).
b.
Install the access panel (on page
24
).
c.
Slide the server back into the rack.
12.
Connect each power cord to the server.
13.
Connect each power cord to the power source.
14.
Press the Power On/Standby button.
Summary of Contents for ProLiant ML350p Gen8
Page 19: ...Component identification 19 Item Connector Description 5 J8 Graphic card power connector ...
Page 30: ...Operations 30 ...
Page 39: ...Setup 39 12 Remove the air baffle 13 Remove the fan cage ...
Page 46: ...Hardware options installation 46 o Cable routing to box 1 o Cable routing to box 2 ...
Page 137: ...Support and other resources 137 ...
Page 138: ...Support and other resources 138 ...