Hardware options installation 101
b.
Disconnect each power cord from the server.
4.
For tower models, do the following:
a.
Place the server on a flat, level surface with the access panel facing up.
b.
Remove the access panel (on page
23
).
5.
For rack models, do the following:
a.
Extend the server from the rack (on page
24
).
b.
Remove the access panel (on page
23
).
c.
Release thumbscrews and remove the rack bezel.
6.
Remove the existing component cage cover for the SFF drive cage.
7.
Install the SFF drive cage with backplane expander option halfway into the server.
8.
Remove the air baffle (on page
25
).
9.
Remove the fan cage.
Summary of Contents for ProLiant ML350p Gen8
Page 19: ...Component identification 19 Item Connector Description 5 J8 Graphic card power connector ...
Page 30: ...Operations 30 ...
Page 39: ...Setup 39 12 Remove the air baffle 13 Remove the fan cage ...
Page 46: ...Hardware options installation 46 o Cable routing to box 1 o Cable routing to box 2 ...
Page 137: ...Support and other resources 137 ...
Page 138: ...Support and other resources 138 ...