Hardware options installation 69
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
15.
Do one of the following:
o
For tower models, install the bezel.
o
For rack models, if removed, install the security bezel (on page
21
).
Optical drive option
The server supports both DVD-ROM and DVD-RW drives.
1.
Do one of the following:
o
For tower models, open and remove the bezel ("
Remove the tower bezel
" on page
21
).
o
For rack models, if installed, remove the security bezel (on page
21
).
2.
Power down the server (on page
20
).
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
For tower models, do the following:
a.
Place the server on a flat, level surface with the access panel facing up.
b.
Remove the access panel (on page
23
).
5.
For rack models, do the following:
a.
Extend the server from the rack (on page
24
).
b.
Remove the access panel (on page
23
).
c.
Release thumbscrews and remove the rack bezel.
6.
Remove the blank from the drive cage.
Summary of Contents for ProLiant ML350p Gen8
Page 19: ...Component identification 19 Item Connector Description 5 J8 Graphic card power connector ...
Page 30: ...Operations 30 ...
Page 39: ...Setup 39 12 Remove the air baffle 13 Remove the fan cage ...
Page 46: ...Hardware options installation 46 o Cable routing to box 1 o Cable routing to box 2 ...
Page 137: ...Support and other resources 137 ...
Page 138: ...Support and other resources 138 ...