Hardware options installation 80
13.
Close the PCIe retainer latch.
NOTE:
Install the graphic card bracket only if you have installed a double-width graphic card.
14.
Install the graphic card bracket, and then tighten the screws.
15.
Install the fan cage.
16.
Install the air baffle (on page
26
).
17.
Install the access panel (on page
24
).
18.
Do one of the following:
o
For tower models, return the server to an upright position.
o
For rack models, slide the server back into the rack.
19.
Connect each power cord to the server.
20.
Connect each power cord to the power source.
Summary of Contents for ProLiant ML350p Gen8
Page 19: ...Component identification 19 Item Connector Description 5 J8 Graphic card power connector ...
Page 30: ...Operations 30 ...
Page 39: ...Setup 39 12 Remove the air baffle 13 Remove the fan cage ...
Page 46: ...Hardware options installation 46 o Cable routing to box 1 o Cable routing to box 2 ...
Page 137: ...Support and other resources 137 ...
Page 138: ...Support and other resources 138 ...