All YTO
Removal
1. If the analyzer is an Option 002, remove the Tracking Generator before proceeding.
2. Place the analyzer top-side-down on the work bench.
3. Use a
inch wrench to remove
(as a unit).
4. Disconnect W38 at the All Assembly.
5. Remove the All mounting screws (1) shown in Figure 3-18.
6. Disconnect
from All.
Figure 3-18. A11 Mounting Screws
Replacement
1. Reconnect
to All.
2. Place the All Assembly in the analyzer.
3. Secure the All Assembly to the right-side frame using the four screws (1) removed in
“Removal” step 5.
4. Connect W38 to All.
5. Install
Ensure that all of the connections are tight.
6. If the analyzer is an Option 002, install the Tracking Generator.
3-32 Assembly Replacement
Summary of Contents for 8560A
Page 93: ......
Page 150: ... ...
Page 178: ...4 20 Replaceable Parts ...
Page 180: ...4 22 Replaceable Parts ...
Page 182: ...4 24 Replaceable Parts ...
Page 184: ...4 26 Replaceable Parts ...
Page 186: ...4 28 Replaceable Parts ...
Page 188: ...4 30 Replaceable Parts ...
Page 190: ...4 32 Replaceable Parts ...
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 205: ...Bl Figure 5 8 Rear View BTl A20 5 10 Major Assembly and Cable Locations ...
Page 249: ...6 44 General Troubleshooting ...
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 282: ......
Page 307: ......
Page 319: ......
Page 324: ...8 42 IF Section ...
Page 325: ......
Page 326: ......
Page 327: ......
Page 344: ......
Page 397: ......
Page 398: ......
Page 423: ......
Page 441: ...12 18 Display Power Supply Section ...
Page 442: ......
Page 443: ......
Page 449: ...A 6 Component Level Information Packets ...
Page 450: ......