Measurement
43
7.
Press the ENT button.
Layer separation starts. The process display on the screen shows [Layer Separation].
The elapsed time appears (counting up).
Fig. 42 Semi-automatic measurement - Layer separation
8.
Make sure that the solvent and sample water have sufficiently separated, and press
the ENT button.
Cell filling starts. The process display on the screen shows [Fill Cell].
The operation guide display shows [ENT: Next ESC: Drain].
The elapsed time appears (counting up).
Fig. 43 Semi-automatic measurement - Fill Cell
9.
Press the ENT button.
Measurement starts. The process display on the screen shows [Measure].
The operation guide display shows [ESC: Drain].
The elapsed time is shown (counting up). When measurement ends, the measured value
appears.
Fig. 44 Semi-automatic measurement - Measurement