Maintenance
96
19.
Press the ENT button.
The instantaneous value measurement screen appears.
20.
Close the drainage valve and open the fill cell valve referring to "Screen operations
in the manual measurement/calibration mode" (page 14).
Cell filling starts.
21.
Make sure that there is no liquid leakage from the extraction tank. If liquid is
leaking, reassemble the extractor.
22.
Open the fill cell valve and drainage valve referring to "Screen operations in the
manual measurement/calibration mode" (page 14).
Liquid drainage starts.
23.
After liquid drainage is finished, press the ESC button.
The start state of the manual measurement mode returns.
24.
Close the right cover.