Installation
BA_sun_power_pack_LiOn_en_V1.05.docx
V1.05 (20/07/2017) 6140203036
24
7.1.1.
Grounding the housing
1. The grounding point is located on the top of the housing (see Figure 8).
No. Description
1
Grounding point
Figure 8: Grounding point
2. Fix the protective ground conductor with a ring cable lug to the grounding point on
the housing. Use the spring washer and nut supplied for this purpose. The
tightening torque is 12 Nm. Use a suitable protective ground conductor with
appropriate cross-section (not included in the scope of supply).