Installation
BA_sun_power_pack_LiOn_en_V1.05.docx
V1.05 (20/07/2017) 6140203036
33
No.
Description
1
Connecting the battery plus terminal to the upper battery stack
Figure 20: Connecting the plus terminal to the upper battery stack
Note:
The voltages and temperatures of the individual battery cells are acquired via the cables in the
cable harness. This data is needed urgently for trouble-free operation and management of the
system.
Figure 21: Battery stacks with connections