Target Group
BA_sun_power_pack_LiOn_en_V1.05.docx
V1.05 (20/07/2017) 6140203036
5
1.
Target Group
This Operating Manual is meant for dealers, electricians and end users. It describes the
transport, storage, installation, operation, maintenance and disassembly of the
sun|powerpack premium battery system. The work of installation, maintenance and
disassembly should be done only by electricians.
Note:
Proper installation and commissioning must be certified by the respective electrician with his
signature in this operating manual (see chapter 19). The signed operating manual must remain
with the end user of the battery system.