Installation
BA_sun_power_pack_LiOn_en_V1.05.docx
V1.05 (20/07/2017) 6140203036
38
3. Stick the supplied sealing sticker on the cover and housing (see Figure 28)
No. Description
1
Sealing sticker
Figure 28: Sealing of housing
4. Enter the date of commissioning and the details of the installation engineer on the
nameplate of the battery system (Name and Company). The nameplate is located
on both sides of the housing (see sample in Figure 29). Stick the protective foil over
the nameplate afterwards.
Figure 29: Nameplate
– Sample
5. Certify proper assembly and installation of the battery store system in the
appropriate form (see chapter 19.2)