Installation
BA_sun_power_pack_LiOn_en_V1.05.docx
V1.05 (20/07/2017) 6140203036
25
7.2.
Installing the battery stacks
Note:
The system can be operated only when it is completely equipped, i.e. with the two battery stacks
supplied / fix assigned (identical capacity and nominal voltage). Check this based on the
information on the nameplate of the battery stacks.
1. The battery stacks are packed in separate cartons. The cartons should not be
opened with pointy tools or objects (see also Figure of the battery stack in Figure 9).
No. Description
1
Cover for safety fuse (do not remove)
2
Cover for connecting the plus terminal
3
Connection for the cable harness to the battery management system
4
Cover for connecting the minus terminal
5
Cover for minus terminal (do not remove)
Figure 9: Battery stack - Connections