Vertex M
TM
24-Point Continuous Monitor
Appendix A - Detectable Gases
C-8
Gas Name1
TLV
LAL
LDL
Default
Alarm
Level 1
Default
Alarm
Level 2
Range
Alarm Setting
Initial
Analysis
Period
(second)
Time to 1 TLV
(Alarm @ 2 TLV
Concentration
10-ft. Sample
Line)
Chemcassette
Part
Number
Hydrogen Sulfide
(H
2
S)
(Hydrides)
1 ppm
2 ppm
1 ppm
10 ppm
20 ppm
0-50 ppm
2-9.9 ppm
10-19.9 ppm
20-39.9 ppm
40-50 ppm
60
45
30
15
<20 sec
(Alarm @ 10
ppm with 20
ppm H
2
S gas)
1295-0300
Hydrogen Sulfide
(H
2
S)
Low Level
1 ppm
10 ppb
8 ppb
250 ppb
500 ppb
0-2000 ppb
10-99 ppb
100-499 ppb
500-999 ppb
1000-2000 ppb
480
240
120
60
<40 sec
(Alarm @ 500
ppb with 1 ppm
H
2
S gas)
1295-0223
Hydrogen Sulfide XP
(H
2
S)
1 ppm
1 ppm
0.5 ppm
10 ppm
20 ppm
0-50 ppm
1-4.9 ppm
5-9.9 ppm
10-50 ppm
30
15
10
<20 sec
(Alarm @ 10
ppm w/ 20 ppm
H
2
S gas)
1295-0226
Hydrogen Sulfide XP4
(H
2
S)
1 ppm
1 ppm
0.5 ppm
10 ppm
20 ppm
0-50 ppm
1-4.9 ppm
5-9.9 ppm
10-50 ppm
30
15
10
<20 sec
(Alarm @ 10
ppm with 20
ppm H
2
S gas)
1257-9300
Hydrogen Sulfide XP
(H
2
S)
Low Level
1 ppm
20 ppb
15 ppb
500 ppb
1000
ppb
0-2000 ppb
20-99 ppb
100-199 ppb
200-399 ppb
400-2000 ppb
120
60
30
15
<25sec
(Alarm @ 500
ppb with 1000
ppb H
2
S gas)
1295-0226
Hydrogen Sulfide XP4
(H
2
S)
Low Level
1 ppm
20 ppb
15 ppb
500 ppb
1000
ppb
0-2000 ppb
20-99 ppb
100-199 ppb
200-399 ppb
400-2000 ppb
120
60
30
15
<15sec
(Alarm @ 500
ppb with 1000
ppb H
2
S gas)
1257-9300
Nitrogen Dioxide
(NO
2
)
3 ppm
0.5 ppm
0.3 ppm
3 ppm
6 ppm
0-30 ppm
0.5-8.9 ppm
9-30 ppm
240
120
<130 sec
1295-0220
Nitrogen Trifluoride
(NF
3
)
Pyrolyzer Only
10 ppm
1 ppm
1 ppm
10ppm
20 ppm
0-50 ppm
1-9.9 ppm
10-19.9 ppm
20-39.9 ppm
40-50 ppm
40
20
10
10
<70 sec
1295-0225
TLV - Threshold Limit Value LAL - Lowest Alarm Level LDL - Lower Detectable Limit
1. “-1” calibrations allow more stain development but will extend response times
2. Minimum Sample Time
Summary of Contents for Vertex M
Page 8: ...1 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 1 Introduction ...
Page 25: ...Vertex MTM 24 Point Continuous Monitor Section 1 Introduction 1 18 ...
Page 26: ...2 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 2 Installation ...
Page 35: ...Vertex MTM 24 Point Continuous Monitor Section 2 Installation 2 10 ...
Page 36: ...3 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 3 Startup ...
Page 40: ...Vertex MTM 24 Point Continuous Monitor Section 3 Startup 3 5 Figure 3 1 Vertex M Main Screen ...
Page 77: ...4 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 4 Operation ...
Page 93: ...Vertex MTM 24 Point Continuous Monitor Section 4 Operation 4 17 Figure 4 9 Filter Options ...
Page 109: ...Vertex MTM 24 Point Continuous Monitor Section 4 Operation 4 33 ...
Page 125: ...5 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 5 Maintenance ...
Page 134: ...Vertex MTM 24 Point Continuous Monitor Section 5 Maintenance 5 10 ...
Page 140: ...Vertex MTM 24 Point Continuous Monitor Section 5 Maintenance 5 16 ...
Page 141: ...6 1 Vertex M TM Technical Handbook 6 Troubleshooting ...
Page 164: ...Section 6 Troubleshooting 6 24 ...
Page 166: ...Vertex MTM 24 Point Continuous Monitor Appendix A Installation Drawings A 2 A 1 Introduction ...
Page 170: ...Vertex MTM 24 Point Continuous Monitor Appendix A Installation Drawings A 6 ...
Page 173: ...Vertex MTM 24 Point Continuous Monitor Appendix A Installation Drawings A 9 ...
Page 174: ...B 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook A Specifications ...
Page 178: ...C 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook A Detectable Gases ...
Page 193: ...Vertex MTM 24 Point Continuous Monitor Appendix A Replacement and Consumable Items D 4 ...
Page 240: ...Vertex MTM 24 Point Continuous Monitor Appendix A 4 20mA Analog Output Option G 4 ...
Page 250: ...Vertex MTM 24 Point Continuous Monitor Appendix A Warranty Statement I 4 ...