Vertex M
TM
24-Point Continuous Monitor
Section 3 - Startup
3-2
3.1 Startup
This section describes the Vertex M System startup
sequence.
3.1.1 Initial Startup
Use this section to turn on your Vertex M System and to
configure the analyzer modules for specific gas locations.
There are six parts to this startup procedure:
•
3.3 Verify Installation
•
3.4 Power Up
•
3.5 Start Program
•
3.6 Configuration Utility
•
3.7 Load Tape
•
3.8 Leak Checking Sample Lines
•
3.9 Verify Flow Rates and Supply Vacuum
3.1.2
Factory Configuration
Honeywell Analytics loads all software on the DAq at
the factory. The Universal Chemcassette
®
Analyzers are
configured for the mineral acid family of gases and the
Pyrolyzer Analyzers for NF
3
. You will need to configure
each point for the target gases at your facility.
3.2 Getting Started
Before startup and configuration, gather the following
information:
• The location to which each point is connected
• Target gas at each location
• Alarm levels
• Relay configuration
3.3 Verify Installation
Ahead of the startup sequence, make sure that the
following installation steps have been completed:
• Sample lines
• Exhaust line
• AC power connection
• Relay wiring
See
Section 2 Installation
for connection details.
3.4 Power Up
Use the rack power switch behind the front door to
power up the Vertex M System.
1. Open front door.
2. Turn on rack power switch.
3. Turn on power switch to appropriate analyzers.
4. Close and latch front door.
After 15 seconds, the analyzer status LEDs sequence
four times through all colors.
Rack Power Switch
Analyzer / Pyrolyzer
Power Switches and Indicators
Summary of Contents for Vertex M
Page 8: ...1 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 1 Introduction ...
Page 25: ...Vertex MTM 24 Point Continuous Monitor Section 1 Introduction 1 18 ...
Page 26: ...2 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 2 Installation ...
Page 35: ...Vertex MTM 24 Point Continuous Monitor Section 2 Installation 2 10 ...
Page 36: ...3 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 3 Startup ...
Page 40: ...Vertex MTM 24 Point Continuous Monitor Section 3 Startup 3 5 Figure 3 1 Vertex M Main Screen ...
Page 77: ...4 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 4 Operation ...
Page 93: ...Vertex MTM 24 Point Continuous Monitor Section 4 Operation 4 17 Figure 4 9 Filter Options ...
Page 109: ...Vertex MTM 24 Point Continuous Monitor Section 4 Operation 4 33 ...
Page 125: ...5 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook 5 Maintenance ...
Page 134: ...Vertex MTM 24 Point Continuous Monitor Section 5 Maintenance 5 10 ...
Page 140: ...Vertex MTM 24 Point Continuous Monitor Section 5 Maintenance 5 16 ...
Page 141: ...6 1 Vertex M TM Technical Handbook 6 Troubleshooting ...
Page 164: ...Section 6 Troubleshooting 6 24 ...
Page 166: ...Vertex MTM 24 Point Continuous Monitor Appendix A Installation Drawings A 2 A 1 Introduction ...
Page 170: ...Vertex MTM 24 Point Continuous Monitor Appendix A Installation Drawings A 6 ...
Page 173: ...Vertex MTM 24 Point Continuous Monitor Appendix A Installation Drawings A 9 ...
Page 174: ...B 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook A Specifications ...
Page 178: ...C 1 Vertex MTM 24 Point Continuous Monitor Vertex M TM Technical Handbook A Detectable Gases ...
Page 193: ...Vertex MTM 24 Point Continuous Monitor Appendix A Replacement and Consumable Items D 4 ...
Page 240: ...Vertex MTM 24 Point Continuous Monitor Appendix A 4 20mA Analog Output Option G 4 ...
Page 250: ...Vertex MTM 24 Point Continuous Monitor Appendix A Warranty Statement I 4 ...