Initial Start-up
12/00
UDC2300 Controller Product Manual
21
3 Initial
Start-up
3.1 Overview
This section gives you the information necessary to start up your controller prior to
configuration. Review the Operator Interface portion to make sure you are familiar with
the indicator definitions and key functions.
3.2 Powering Up the Controller
Apply Power
When power is applied, the controller will run three diagnostic tests. After these tests are
completed, “TEST DONE” is displayed.
Test Failures
If one or more of these tests fail, the controller will go to the Failsafe Manual Mode, and
FAILSF will flash in the lower display and a message indicating which test failed will
appear in the lower display. Then, “DONE” will appear in the lower display.
Summary of Contents for UDC 2300
Page 1: ...UDC2300 Universal Digital Controller Product Manual 51 52 25 98 12 00 ...
Page 30: ...Installation 20 UDC2300 Controller Product Manual 12 00 ...
Page 62: ...Monitoring 52 UDC2300 Controller Product Manual 12 00 ...
Page 80: ...Operation 70 UDC2300 Controller Product Manual 12 00 ...
Page 92: ...Setpoint Rate Ramp Program Operation 82 UDC2300 Controller Product Manual 12 00 ...
Page 124: ...Troubleshooting Service 114 UDC2300 Controller Product Manual 12 00 ...
Page 170: ...Function Parameter Reference Guide 160 UDC2300 Controller Product Manual 12 00 ...
Page 176: ...Index 166 UDC2300 Controller Product Manual 12 00 ...
Page 177: ......
Page 178: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......