Operation
SDC / DHC
92
EN2H-0221GE51 R0812
Para-
meter
Designation
Setting range / Setting values
Factory
setting
Setting
17
Behaviour of heat
generator during
follow-up time
AUTO
Setpoint at heat gen-
erator depending on
demand
AUTO
OFF
Heat generator off
during follow-up time of
solar charging pump
28
Switch-on delay
time for electrical
water heater
0 … 600 min
60 min
29
Offset setpoint for
Electrical water
heater
-1 … 99 K
-5 K
5.4.4 "Direct heating circuit" menu (UNMIXED CIRC)
This menu contains all parameters required to program the un-
mixed heating circuits, except the switching time programs.
Para-
meter
Designation
Setting range / Setting values
Factory
setting
Setting
Heat-
ing
curve
Slope
OFF, 0.02 to 3.50
1.5
Re-
duced
Reduced operation ECO
Switch-off operation
ECO
RED
Lowering operation
Heat-
ing
system
Heating system
UFH
Under floor heating
RAD
RAD
Radiator
CON
V
Convector heater
Summary of Contents for DHC
Page 1: ...EN2H 0221GE51 R0812 Smile SDC heating and district heating controller SERVICE MANUAL ...
Page 2: ...EN2H 0221GE51 R0812 ...
Page 10: ...Contents SDC DHC 10 EN2H 0221GE51 R0812 ...
Page 36: ...Operation SDC DHC 36 EN2H 0221GE51 R0812 Operating overview ...
Page 66: ...Operation SDC DHC 66 EN2H 0221GE51 R0812 ...
Page 261: ......